CITY OF LETHBRIDGE WASTE & RECYCLING MRF

Date

Project Client

Procurement

2019

City of Lethbridge

Construction Management

Design Team

Ian Moxon Architect Inc.

BCB Engineering Ltd.

Sunwise Engineering Ltd.

Working with the City of Lethbridge and its Canadian equipment supplier, design parameters were established to construct a 45,497 SF (4,227 SM) office, three bay loading dock with an elevated service space, and a 315ft long x 130ft wide x 40ft high warehouse facility.

The construction included two below slab pits, three elevated sort cabins and an office space which has staff offices, a lunch room, and barrier-free change rooms for both female and male.